Sanquhar II Windfarm

Project Requirement

To support the construction of a new wind farm, JPS Utilities was appointed to undertake the civil engineering works required for the installation of the underground electrical infrastructure. The project involved excavating joint pits and installing approximately 6,400 metres of ducting to facilitate a new 11kV backup electrical supply. Cable jointing was to be completed by others following the completion of the civil works.

What We Did

  • Excavated joint pits in accordance with the SPEN-approved design.
  • Installed approximately 6,400 metres of 150mm red Emtelle duct for the 11kV cable route.
  • Installed approximately 6,400 metres of 63mm green Emtelle fibre duct alongside the power duct.
  • Installed draw ropes and warning tape throughout the duct route.
  • Carried out soft sand backfill and reinstatement in accordance with SPEN specifications.
  • Prepared the route for the installation of 185mm² three-core cable, with cable jointing undertaken by others.

The Outcome

The project was completed in accordance with the SPEN design and programme, providing a fully compliant underground duct network ready for cable installation and jointing. The completed infrastructure enables the provision of a reliable 11kV backup electrical supply, supporting the energisation and long-term operation of the new wind farm while ensuring future access for maintenance through the integrated fibre duct installation.

Our Projects

We support a wide range of water and utility projects across Ayrshire, the Central Belt and further afield.

A Word From Our Clients

I have always found the team to be reliable, efficient and highly skilled. JPS have delivered complex design solutions involving large, regulated operators such as Scottish Water and Scottish Power to the highest standard. I have always found JPS to be value for money and would highly recommend their services.

- Stuart Walker

Consultant

I’d like to say that I was very impressed by the guys that were on the job. The work area was tidy and safe with the barriers up. Kept me up to date with progress when I stopped to speak. The job was quickly completed and left incredibly tidy with grass turned back in – you wouldn’t know they’d been there!

- Janice Yuille

Director, ATV Services