Corriegills Tank, Isle of Arran

Project Requirements

The project required a durable access solution that would provide safe access for operational personnel while meeting site-specific safety requirements.

What We Did

JPS Utilities designed, fabricated and installed a bespoke access platform complete with an adjustable protective barrier system. The structure was tailored to suit the existing tank infrastructure and operational requirements.

The Outcome

The completed installation provided safe, reliable access for maintenance and inspection activities while enhancing site safety for operational teams.

Our Projects

We support a wide range of water and utility projects across Ayrshire, the Central Belt and further afield.

A Word From Our Clients

I have always found the team to be reliable, efficient and highly skilled. JPS have delivered complex design solutions involving large, regulated operators such as Scottish Water and Scottish Power to the highest standard. I have always found JPS to be value for money and would highly recommend their services.

- Stuart Walker

Consultant

I’d like to say that I was very impressed by the guys that were on the job. The work area was tidy and safe with the barriers up. Kept me up to date with progress when I stopped to speak. The job was quickly completed and left incredibly tidy with grass turned back in – you wouldn’t know they’d been there!

- Janice Yuille

Director, ATV Services