Project Requirements
The project was designed to link existing water mains and improve supply capacity within the Lamlash network through the installation of new pipework and pressure management infrastructure.
What We Did
JPS Utilities established site access and protection measures, including stock fencing and drainage installations to support construction activities. We stripped and stored topsoil across the working area before excavating and installing 253m of new barrier pipe.
The project also included the installation of three 80mm pressure reducing valves on a ductile iron bypass arrangement. Following installation, we completed pressure testing, chlorination, sampling and commissioning before undertaking comprehensive agricultural reinstatement across the easement.
The Outcome
The scheme successfully strengthened the local water network, improving supply resilience and operational performance for customers in the Lamlash area.