Melrose SR, Scottish Borders

Project Requirements

The project required the installation of a pressure reducing valve (PRV) bypass arrangement on an existing cast iron trunk main to improve operational flexibility and network management.

What We Did

JPS Utilities carried out deep excavations to expose the existing 16-inch cast iron distribution main, implementing safe excavation techniques and stepped excavations where required.

We supplied, fabricated and installed a bespoke 150mm ductile iron PRV bypass assembly, ensuring compatibility with the existing network infrastructure. Following installation, the site was fully reinstated, including agricultural land restoration and chamber construction works.

The Outcome

The completed bypass installation enhanced operational control of the water network while providing a robust and reliable solution designed for long-term performance.

Our Projects

We support a wide range of water and utility projects across Ayrshire, the Central Belt and further afield.

A Word From Our Clients

I have always found the team to be reliable, efficient and highly skilled. JPS have delivered complex design solutions involving large, regulated operators such as Scottish Water and Scottish Power to the highest standard. I have always found JPS to be value for money and would highly recommend their services.

- Stuart Walker

Consultant

I’d like to say that I was very impressed by the guys that were on the job. The work area was tidy and safe with the barriers up. Kept me up to date with progress when I stopped to speak. The job was quickly completed and left incredibly tidy with grass turned back in – you wouldn’t know they’d been there!

- Janice Yuille

Director, ATV Services